Mail Sorting Center

With a total construction area of 45,000 m², the project mainly comprised the utilization of a State-of-art Smart conveyor system to be the first and most advanced mail Sorting facility in TURKEY. Systems sorter capacity will be 6000 pcs/hour and allow increase up to 8000 pcs/hour considering possible future requirements. System is also capable to be configured in such form to ensure continuous year-round operation with minimum 20 hours per day).
Salient features of the System are given below:
* 8 (eight) Truck arrival areas (discharge area) (with telescopic conveyor)
* 2 (two) Workstation (monitor + laser printer)
* 8+2 ring scanner
* 22 (twenty two) output conveyor tracks for output area (truck loading)
* An x-ray area (X-ray devices including 2 automatic x-rays devices)
In addition to above, the system further offers;
* 2000 pcs/hour system loading at the Arrival point.
* 2000 pcs/hour system loading at the internal service sorting areas (manual & automatic)
* 4000 pcs/hour to be reserved for truck loading at the output Area.

Proje Detayları

Employer: T.R. Prime Ministry, Housing Development Administration of Turkey
Location: Istanbul, Hadimkoy
Project Duration: 2009 - 2011
Construction Area: 45.500 m²